How it works

A step at a time, starting with a quote

We look after the factory, inspections, freight and stock. You get a fixed price and order parts when you need them.

The four steps

  1. Quote

    Send a drawing or sample and your yearly usage. We come back with a fixed NZD price per part.

  2. Pilot lot

    A small run is airfreighted to you. You check it and sign it off before anything else is made.

  3. First batch

    A production run by sea, sized to what you actually use, inspected before it ships.

  4. Ongoing supply

    We hold stock in NZ and you order parts as you need them.

Quality

Factory audits

Our independent inspection partner in India checks each factory on site before we use it.

Signed-off pilot

Your approved pilot part is the standard every production run is checked against.

Pre-shipment inspection

Dimensions, welds and finish checked on every run before it leaves the factory.

Certificates

Material, test and inspection paperwork supplied with structural orders.

Supply terms

Once you're ordering regularly, we put a simple supply agreement in place.

We agree to

  • Hold an agreed amount of your stock in NZ
  • Keep a fixed price, reviewed every 6–12 months
  • Supply parts that match your signed-off pilot
  • Handle the factory, freight, customs and inspections

You agree to

  • Give us a yearly usage forecast
  • Order parts as you need them
  • Take any stock we're holding for you if the design changes or orders stop
  • Give a few months' notice to wind down

Common questions

How much can I save?

It depends on the part. We aim to save you 30% or more on what you pay a local supplier, delivered. A quote shows you the real number before you commit to anything.

What quantities do you work with?

Ideally a few hundred or more of the same part a year, ordered on a regular basis.

How long does it take?

A pilot lot is airfreighted, usually within weeks of approving the quote. The first production batch comes by sea and takes a few months. After that, parts come out of our NZ stock when you order them.

How is the price set?

A fixed NZD price per part, delivered. We review it every 6 to 12 months, or sooner if steel prices or exchange rates move a lot.

What if a part isn’t right?

Every run is inspected against your drawing and signed-off pilot before it ships. If parts don’t match, we put it right. You deal with us, not a factory overseas.

Can you supply certificates?

Yes. For structural parts we supply material and test certificates and the inspection report. Tell us what your engineer needs when you ask for a quote.

Send us a drawing

Tell us roughly how many you use a year. We'll come back with a fixed price per part and a straight comparison with what you pay now.

Get a quote